Big Jimmy 3 entries, 2 photos Back to the log

The book is laid out for the paper chosen above, and the print dialog will follow it, so pick the paper here rather than there. Turn background graphics on so the cover photograph prints, and leave margins at their default. The page numbers and the chapter running heads are drawn by the browser into the page margins, so they exist only on paper: check the print preview rather than this screen for them, and turn Headers and footers off there so Chrome's own furniture does not crowd them out. Chrome and Edge print them, Safari and Firefox print the same book without them.

new build

Big Jimmy

Jimmy Skiff II

ozzmeister00 · 2026

A build log

Big Jimmy

Jimmy Skiff II


kept by ozzmeister00

2026

The boat

Jimmy Skiff II

Designer
John C. Harris
Plans from
Chesapeake Light Craft
Length overall
13′ 2″ (4.01 m)
Beam
4′ 4″ (1.32 m)
Construction
stitch and glue
Started
2 July 2026
Built by
ozzmeister00

First boat,

What it took

By the numbers

16
Hours at the boat
0.4 months
From first day to last
3
Days written up
2
Photographs
122
Words written

The work

Contents

Chapter 01

Hull Exterior

Turning over, keel and skeg, rubrails, exterior structure.

2 days 9 hours from September 2026

Hull Exterior 4 h

Flip, outwales, and first epoxy coat on bottom surfaces

Flipped the boat over Rounded over the daggerboard trunk slot Faired and rounded over the bottom side of the outwales Cleaned up the skeg fillet Applied first coat of epoxy to the daggerboard trunk slot, skeg, and the bottom side of the outwales

Also touched up cockpit epoxy where I'd missed spots yesterday because seeing it in daylight and upside down helped.

Chapter 02

Interior & Cockpit

Bulkheads, seats, buoyancy, sole, storage.

1 day 7 hours from September 2026

Interior & Cockpit 6.5 h

Cockpit fill coats

Finished sanding down earlier epoxy crimes, applied two more coats of epoxy to help fill out and cover spots where the sander had blown through.

Also started prepping steering gear for varnish.

Jimmy Skiff II: Cockpit fill coats
Matt

Looking good!


Hull Exterior 5 h

Hull primer 1

Hull washed, sanded, and first coat of primer. Blew through the epoxy at one corner of the transom, so I’ll seal that up later before varnishing it.

Jimmy Skiff II: Hull primer 1

boatbuildlog.com

Big Jimmy
3 entries, 2 photographs, written down as the work was done.

The words and photographs in this log belong to ozzmeister00.

The log itself lives at
https://boatbuildlog.com/builds/big-jimmy

Printed 26 October 2026