Mahalini build 2 entries, 22 photos Back to the log

The book is laid out for the paper chosen above, and the print dialog will follow it, so pick the paper here rather than there. Turn background graphics on so the cover photograph prints, and leave margins at their default. The page numbers and the chapter running heads are drawn by the browser into the page margins, so they exist only on paper: check the print preview rather than this screen for them, and turn Headers and footers off there so Chrome's own furniture does not crowd them out. Chrome and Edge print them, Safari and Firefox print the same book without them.

new build

Mahalini build

Malahini

Jeff Stevenson · 2026

A build log

Mahalini build

Malahini


kept by Jeff Stevenson

2026

The boat

Malahini

Designer
Glen-L Marine
Length overall
15′ 11″ (4.85 m)
Beam
6′ 7″ (2.01 m)
Construction
plywood on frame
Started
9 April 2026
Built by
Jeff Stevenson

We own a hand-made wood boat, but this is the first one we’ve built ourselves.

What it took

By the numbers

1 months
From first day to last
2
Days written up
22
Photographs
34
Words written

The work

Contents

Chapter 01

Strongback & Molds

Building the strongback or ladder frame and setting up station molds.

2 days from September 2026

Strongback & Molds

Getting the frames and strong back laid out.

So far it’s been a fun experience, kind of monkey read step, monkey do step, monkey get banana.

Malahini: Getting the frames and strong back laid out.
Photo 1
Malahini: Getting the frames and strong back laid out.
Photo 2
Malahini: Getting the frames and strong back laid out.
Photo 3
Malahini: Getting the frames and strong back laid out.
Photo 4
Malahini: Getting the frames and strong back laid out.
Photo 5
Malahini: Getting the frames and strong back laid out.
Photo 6
Malahini: Getting the frames and strong back laid out.
Photo 7
Malahini: Getting the frames and strong back laid out.
Photo 8
Malahini: Getting the frames and strong back laid out.
Photo 9
Malahini: Getting the frames and strong back laid out.
Photo 10
Malahini: Getting the frames and strong back laid out.
Photo 11
Walt Hansen

"kind of monkey read step, monkey do step, monkey get banana" - OK, that made me laugh. I so get it.


Strongback & Molds

Framing work continues

We are plugging away on the frame. Chine and shear. I will start planing soon.

Malahini: Framing work continues
Photo 1
Malahini: Framing work continues
Photo 2
Malahini: Framing work continues
Photo 3
Malahini: Framing work continues
Photo 4
Malahini: Framing work continues
Photo 5
Malahini: Framing work continues
Photo 6
Malahini: Framing work continues
Photo 7
Malahini: Framing work continues
Photo 8
Malahini: Framing work continues
Photo 9
Malahini: Framing work continues
Photo 10
Malahini: Framing work continues
Photo 11

boatbuildlog.com

Mahalini build
2 entries, 22 photographs, written down as the work was done.

The words and photographs in this log belong to Jeff Stevenson.

The log itself lives at
https://boatbuildlog.com/builds/mahalini-build

Printed 24 October 2026