Pams Carver 4 entries, 43 photos Back to the log

The book is laid out for the paper chosen above, and the print dialog will follow it, so pick the paper here rather than there. Turn background graphics on so the cover photograph prints, and leave margins at their default. The page numbers and the chapter running heads are drawn by the browser into the page margins, so they exist only on paper: check the print preview rather than this screen for them, and turn Headers and footers off there so Chrome's own furniture does not crowd them out. Chrome and Edge print them, Safari and Firefox print the same book without them.

modification

Pams Carver

Captain

Pam Zegunis · 2026

A build log

Pams Carver

Captain


kept by Pam Zegunis, Hessel, Michigan

2026

The boat

Captain

Designer
Carver Boat Corporation
Plans from
Carver
Hull
wood
Construction
lapstrake
Started
13 June 2026
Built by
Pam Zegunis
Built at
Hessel, Michigan

My first restoration. I'm a graduate of a Boat Building schools- let's see how much I learned!

What it took

By the numbers

40
Hours at the boat
1.8 months
From first day to last
4
Days written up
43
Photographs
191
Words written

The work

Contents

Chapter 01

Planning & Parts

Working out what to fit, what it costs, and whether it will actually fit.

1 day from May 2026

Planning & Parts

Got her home

Picked up May 16. The plan was to re-do the upholstery and strip/varnish exterior. Maybe fix a cracked spray rail. That was the plan.

Chapter 02

Deck Hardware

Cleats, rails, ladders, anchor rollers, tow points, T-tops and hardtops.

2 days 16 hours from June 2026

Deck Hardware 8 h

Hardware and upholstery removal

Removed all hardware, and discovered outwale rot under the rubrail. Discovered upholstery was stapled to seats and both were badly damaged.


Deck Hardware 8 h

As I removed interior dash vinyl, I discovered 1) a million staples, 2) the dash was several pieces stacked and 3) the dash had pulled away from the sides and was shored up with a 2x4. As I removed vinyl coverings, it was badly peeling up the plywood underneath.


24 h

Gutted

Removed back seat, back 'fins' (I'm not sure what they're called- they prevent water from coming in over the back), and tried to remove broken starboard spray rail. The spray rail fasteners were hidden under the thwart riser...so I took out the front seat and thwart riser. Then I figured if I was removing one, I may as well do the port side, too. And the dash had to be re-constructed because the fastening end was all chewed up. And the deck was in poor shape and an easy replacement. So now I'm left with an empty hull. Literally.

Matt

lots of work!! Looking good.

boatbuildlog.com

Pams Carver
4 entries, 43 photographs, written down as the work was done.

The words and photographs in this log belong to Pam Zegunis.

The log itself lives at
https://boatbuildlog.com/modifications/pams-carver

Printed 2 October 2026