Stitch and glue 2: intentional design8 entries,
48 photosBack to the log
The book is laid out for the paper chosen above, and the print dialog will follow it,
so pick the paper here rather than there. Turn background graphics on
so the cover photograph prints, and leave margins at their default. The page numbers
and the chapter running heads are drawn by the browser into the page margins, so they
exist only on paper: check the print preview rather than this screen for them, and turn
Headers and footers off there so Chrome's own furniture does not crowd
them out. Chrome and Edge print them, Safari and Firefox print the same book without
them.
new build
Stitch and glue 2: intentional design
Micro-Wherry
Dave · 2026
A build log
Stitch and glue 2: intentional design
Micro-Wherry
kept by Dave
2026
The boat
Micro-Wherry
Plans from
David Rogers
Started
13 August 2026
Built by
Dave
This is the second boat I have designed and built, with the first one still floating, but leaving me wanting more in the looks and performance department
What it took
By the numbers
25
Hours at the boat
0.4 months
From first day to last
8
Days written up
48
Photographs
1,080
Words written
$510
Spent in all
Went into the boat
$475.00
Tool or consumable
$35.00
Total
$510.00
The work
Contents
01Plans & Lofting
Sep 2026 · 5h
02Hull Panels
Sep 2026 · 3h
03Stitch & Assembly
Sep 2026 · 5h
04Fillets & Taping
Sep 2026 · 12h
Chapter 01
Plans & Lofting
Reading the drawings, lofting full-size, making patterns and templates.
1 day5 hoursfrom September 2026
17 Sep 2026Plans & Lofting5 h
Design Phase - Requirements and Desirements
This boat has a very limited purpose: to paddle ~50ft from a sandy canoe launch to a sailboat on a mooring in a protected harbor, tie off to the mooring for a couple hours while I go sailing, the do the same in reverse on the way back. It has 2 predecessors: a whitewater kayak whose major drawback is that it has no carrying capacity, and a micro-dinghy (stitch and glue 1) which has many drawbacks, mostly tracking, comfort, and fore/aft stability. But it is capable of being completely filled with gear stuffed around me, sail bags and life jackets and all my sailing stuff can ride with me in the boat to the mooring.
So the brief on the new one has a lot of requirements.
Get to the mooring
Carry gear
Side to side stability as much as is reasonable, but principally fore/aft stability
As well as several desirements:
Look more “boat-y”. Neither of the two previous boats were super pretty looking because I never put any thought or effort into it, but I want that now.
Be super lightweight. I read a book recently which features a pack canoe, which weighs something like 15lbs. As of the time of writing this post, I am aiming for sub-20.
Be as paddle-able as a folding kayak. Neither of the predecessors were particularly paddle-able, I want to change that with this one.
Photo 1 Photo 2
Chapter 02
Hull Panels
Scarfing plywood, cutting panels, milling strips or planking stock.
1 day3 hoursfrom September 2026
20 Sep 2026Hull Panels3 h
Step 0 - prep hull panels for stitching
Had hull panels cut out by Chesapeake Light Craft from 4mm okume plywood. Rails are 1/4 x 3/4 solid sapele. Boat length ~93 in, so all panels would fit in a single sheet of plywood with no scarf. In retrospect, I should have spent more time making some of the panels have more fair curves. I still think it will look fine. Step 0 of the actual build per the recommendation of CLC experts was to glue the outwhales on to reinforce the plywood during stitching. The strips are not thick enough to be adequately clamped by the number of clamps I have, so the bonding thickness varies along the length of the panel. Bonding was done with epoxy thickened with cabosil, clamped, and un-thickened epoxy carefully poured in the interior corner between panel and strip for smooth transition and to try to flow into any gaps.
Photo 1 Photo 2 Photo 3 Photo 4
Chapter 03
Stitch & Assembly
Wiring or clamping the hull together and getting it fair and true before glue.
3 days5 hoursfrom September 2026
21 Sep 2026Stitch & Assembly
Step 1: Stitching
Stitched all hull panels with zip ties. Ran out of zip ties and had to run to the hardware store. Stitching took a lot longer than I thought - last time I had ~20ft of seams on a 5ft boat from 2-plank hull shape, this one has ~60ft on an 8ft boat from 4-plank shape.
Next time I would definitely shell out for a sheet of big box store plywood to use as a nice big table, working in the floor for the first 2hrs until each side was stiff enough on its own to bridge the sawhorses was painful.
Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6
23 Sep 2026Stitch & Assembly3 h
Step 2 - the Cinch
Went through boat and cinched all zip ties taut, then went through again and (where needed) cinched all zip ties tight. I bought a saw where before I had borrowed others. I used it to cut the tips off the overhanging front outwhale, allowing the top planks to meet flush at the bow. Also used saw to cut spare stick stock to make thwarts to seat correct beam of the boat. It looks a bit wide, and I may play around with this a bit later. Initial plan was to exclude thwarts from final design, but may change that plan if the boat doesn’t get significantly more stiff with fiberglass.
Most gaps closed, bow planks did not want to sit edge-to-edge so there are some ~3-4mm gaps between the top of plank 1 and bottom of plank 2, and decreasing in size to 0 between plank 3 and 4. There is a ~2-3mm gap for 200mm or so at the rear end of the plank 1-2 joint, where the concave transom inverts to a convex shallow v/roundish hull in the rear most ~400mm of boat length. All out-of-plane misalignment is less than the thickness of the panels, so will sand out when I go to sand the outside. I am tired of cinching zip ties. I am going to glue the seams.
CA glued all seams. Went heavier on the glue. Was told it might pop out, and wanted to prevent that, especially in high stress areas. The way I tilted the hull induced a very slight twist, which I can live with but would rather not, so I’ll try to “de-twist” by reversing the direction of the single support in the next step.
Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6
Chapter 04
Fillets & Taping
Epoxy fillets, taped seams, structural joints.
3 days12 hoursfrom September 2026
26 Sep 2026Fillets & Taping7 h
Step 4: first tape
Removed port side stitches. Realized I went a little too heavy on some of the CA glue when some stitches wouldn’t come out. Sanded everything flush, wiped with alcohol, dry fit tape. Added fillets, cured for ~2hr. Put tape in sticky fillets, and wet out. The lower 2 seams have a little too much epoxy in the center 2ft or so of the boat, and one area on the tape self-edge is starved, but I will sand off when I feather. Learned not to try to wet all tape at once. Next time will do bottom two, then top one. Also turned over, removed other stitches, and sanded other side smooth and wiped.
Added fillets to inside of starboard seams. Went a lot smoother this time thanks to experience from last time. Took less than 30min to mix and fillet whole side.
Tape was “dry” laid on tacky but hard-ish fillets, they wetted out. Smoother than yesterday, but still took over an hour for 3 tapes.
Photo 1 Photo 2 Photo 3
30 Sep 2026Fillets & Taping3 h
Step 6: keel line and transom tape
Filleted and taped the front 7/8 of the boat with the bow down, waited an hour, then filleted and taped the transom and rear foot of the keel line with the stern down.
I used a bunch of CA glue in all the seams to try to avoid panels popping out and needing a re-glue, but the front bottom corner still popped out, so I put two zip ties in and left them. Still a bunch of my thickened fillet epoxy came out that seam, which left a bit of a mess on the outside that will mean more sanding for me. My build process goal this time was to avoid making mistakes that would lead to unnecessary sanding.
I was a lot gentler and more intentional both filleting and wetting out the stern, and I did use a bit too much epoxy but overall a quite happy with the result there.
Photo 1 Photo 2 Photo 3
Matt
One thing I've done in the past to reduce blobs of thickened epoxy coming out the other side is to put blue painters tape on the outside seam of whatever you're trying to fill. That way as you start to pack it in at least it has some type of backstop. You will still have to send, but it won't be as much.
The bill
What it cost
Everything else
4mm okume sheet, cut 1 sheet
Chesapeake light craft
$185.00
3/4 x 1/4 sapele rail, 37ft 1
CLC
$65.00
1.5gal mas lv epoxy 1
CLC
$175.00
Fillet bags, CA glue, wood extras, bits and bobs 1
CLC
$50.00
Zip ties and saws 1
Ace hardware
$35.00
Total spent
$510.00
boatbuildlog.com
Stitch and glue 2: intentional design
8 entries,
48 photographs,
written down as the work was done.
The words and photographs in this log belong to Dave.