boatbuildlog
  1. Posted an entry on Grey Seal

    Next pic shows my spiling plank made with “hinges” out of MDF strips.

  2. Posted an entry on Grey Seal

    This project was started in about 2012.

  3. Replied on their own log Eland 36

    Hi Dave , first prime coat of neat epoxy then I thickened it a bit and rolled it on with a 4” mohair roller.

  4. Posted an entry on Eland 36

    Cabin top beams

  5. Published the build log Grey Seal

  6. Posted an entry on Grey Seal

    I started this build in 2012 and had a few stop/starts. Main things I have left to do are paint all decks/cabin/cockpit and build a mast. Th...

  7. Posted an entry on Eland 36

    I found a picture of the transom which has two layers of 1/2” and another two layers making up the frame. It’s about 3’6” high and 9’ wide....

  8. Posted an entry on Eland 36

    I’ve started building all the frames starting with the transom and working forwards (Dudley Dix recommends setting up from frame 0.5 first)...

  9. Published the build log Eland 36

  10. Posted an entry on Eland 36

    Cutting and assembling frames