Eland 36 · step
Strongback & Molds
Building the strongback or ladder frame and setting up station molds.
Strongback & Molds on every boat, not just the Eland 36 →
A bit of a milestone today, after much teething troubles. Got the first of 24 ply sheets cutout that makeup the frames. A lot of these consist of multiple pieces spread across at least two sheets and they are joined with jigsaw “teeth” and epoxy.
this is part of transom outer (two layers 12mm ply ) and then two layers of the ‘frame’ that is shown in #1 so all up it’s 48mm thick.
the holes near centre are from left, a tiller hole , four step holes to climb aboard from swim platform, and on the right are cockpit drains.
As long as the tapes are about 3 or 4 inches apart (75 to 100 mm) and roughly parellel, then the next step is crucial in the process, and that is to scan the whole workpiece, with its tapes on, with the router’s cameras and it stores the scan in memory. Every domino on the tape is different so it knows exactly where it is by creating a map and uses it a bit like a gps. It’s uncanny how accurate it is down to thousandth of an inch. When you are routing you need to be sure that the camera has a good view of dominoes even down to brushing away sawdust etc. When routing you are obviously going to...
Hi Cheese, , it’s slowed down a little. I’m currently cutting all the frames which is just more of the same over and over. So rather than posting each frame I’ll wait ‘til I’ve got something a bit more interesting to show. It could be a few months at current pace. Thanks for looking in though.
Purchased a stack of ply and douglas fir with epoxy etc to make a start. But it’ll be slow at first because I have to finish last build as well.
I’ve started building all the frames starting with the transom and working forwards (Dudley Dix recommends setting up from frame 0.5 first) so once I get the shelter setup and building stocks I can start from the first frame. Some of the frames are actually bulkheads and have various pieces of trim glued on. Cleats, door trim and hand-holds etc. I’ve added some of the drawings from Dudley’s website here.
I found a picture of the transom which has two layers of 1/2” and another two layers making up the frame. It’s about 3’6” high and 9’ wide. Beam of the boat is approx 12’ 6”. .
I’ve been making the 3 laminated beams required for this boat’s cabin top. Each one is 75mm square, 10 laminates of 7.5mm. I left them on jig for a few days, then put a ratchet strap on each for a few more days to avoid creep. It’s still fairly cool here coming into spring. Long one is 3 metres, then 2.8 and 2.6.