After our recent marine survey revealed gaps in the keel and frame alignment on our Wooden Shoe 23, it was time for a complete survey fix! In this episode, we address frame gaps at stations 9, 11, 12, and 13, fit and secure the transom, mix Gflex epoxy for sma...
Read these entries in the log → Strongback & Molds on every Wooden Shoe →Strongback & Molds
Building the strongback or ladder frame and setting up station molds.
59 entries from 11 logs, newest work first.
Another morning working on the Navigator and not an once of sawdust. I made a marking jig yesterday to ensure all the stringer notches were square to the apex of the frame angle. Marked all those out this morning then made a routing template so it's quick, ea...
Read these entries in the log → Strongback & Molds on every Navigator →Today I removed all the clamps from the first frames I did an sanded the the edges to get rid of bits of to much epoxy. Than I prepared two foam blocks, the transom and the remaining frame. Took me 3 more hours and was fun.
Read these entries in the log → Strongback & Molds on every Northeaster Dory →We are plugging away on the frame. Chine and shear. I will start planing soon.
Read these entries in the log → Strongback & Molds on every Malahini →Organizing the Shop Before cutting any mahogany, the workshop needed structure. In a small heated shop, raw materials crowd you out quickly. Marine plywood sheets and mahogany take up significant floor space. If they get damp or warp, the material is ruined. I...
Read this entry in the log → Strongback & Molds on every Idea 21 →I’ve been making the 3 laminated beams required for this boat’s cabin top. Each one is 75mm square, 10 laminates of 7.5mm. I left them on jig for a few days, then put a ratchet strap on each for a few more days to avoid creep. It’s still fairly cool here comin...
Read these entries in the log → Strongback & Molds on every Eland 36 →Inner Stem, continued: cleaned up the glue squeeze out.
Read these entries in the log → Strongback & Molds on every Spartan II →Strongback built, frames drawn and built in a couple of days. Amazing system Jeff Spira chose to build his boats. I know he has a few stich and glue designs, but his ply-on-frames are ideal for a beginner. I had trouble with the frame in front of the transom n...
Read this entry in the log → Strongback & Molds on every Bahia 12 →There are 7 frames in the boat. All the frames have cleats glued to them to support the decks. The main deck is cambered athwartship, so the cleats have to be bent or shaped in some way to support the cambered deck. I did this by attaching small blocks to the...
Read this entry in the log → Strongback & Molds on every The Guider →Houseboat update, Friday, December 27, 2019 -- I took advantage of another warm December day to do a little more work on Jersey Girl's aft door frame, installing short pieces of epoxy-finished tongue-and-groove pine at the top on the inside. Eventually, I will...
Read these entries in the log → Strongback & Molds on every Jersey Girl →Since there was a possibility of building more than one boat in the future, we produced a set of frame templates to improve construction accuracy and save layout and production time on subsequent boat builds. Click here to learn more about the frame templates.
Read these entries in the log → Strongback & Molds on every Hot Rod →