-
Posted an entry on Stitch and glue 2: intentional design
Step 2 - the Cinch
-
Posted an entry on Stitch and glue 2: intentional design
Step 1: Stitching
-
Posted an entry on Stitch and glue 2: intentional design
Step 0 - prep hull panels for stitching
-
Published the build log Stitch and glue 2: intentional design
-
Posted an entry on Stitch and glue 2: intentional design
Design Phase - Requirements and Desirements
-
Added a design to the catalog Micro-Wherry