-
Posted an entry on Stitch and glue 2: intentional design
Step 10: smoothing interior tape transitions and glassing inside
-
Posted an entry on Stitch and glue 2: intentional design
Step 9: exterior cloth epoxy
-
Posted an entry on Stitch and glue 2: intentional design
Step 8: outside tape, sanding outside (second time), laying and smoothing cloth
-
Posted an entry on Stitch and glue 2: intentional design
Step 7: sanding the outside (first time)
-
Posted an entry on Stitch and glue 2: intentional design
Step 6: keel line and transom tape
-
Posted an entry on Stitch and glue 2: intentional design
Step 5: second tape
-
Posted an entry on Stitch and glue 2: intentional design
Step 4: first tape
-
Posted an entry on Stitch and glue 2: intentional design
Step 3: CA glue spot weld
-
Posted an entry on Stitch and glue 2: intentional design
Step 2 - the Cinch
-
Posted an entry on Stitch and glue 2: intentional design
Step 1: Stitching
-
Posted an entry on Stitch and glue 2: intentional design
Step 0 - prep hull panels for stitching
-
Published the build log Stitch and glue 2: intentional design
-
Posted an entry on Stitch and glue 2: intentional design
Design Phase - Requirements and Desirements
-
Added a design to the catalog Micro-Wherry