-
Published the build log Glen-L Squirt
-
Posted an entry on Glen-L Squirt
Black G/flex resin seams
-
Posted an entry on Glen-L Squirt
Gluing mahogany onto the aft locker
-
Posted an entry on Glen-L Squirt
Laying the final mahogany deck
-
Posted an entry on Glen-L Squirt
Gluing on the deck plywood
-
Posted an entry on Glen-L Squirt
Fitting the flotation material
-
Posted an entry on Glen-L Squirt
Interior work No. 6
-
Posted an entry on Glen-L Squirt
Painting, second attempt
-
Posted an entry on Glen-L Squirt
Interior work No. 5
-
Posted an entry on Glen-L Squirt
Electrical work and the rest of the wiring
-
Posted an entry on Glen-L Squirt
The numbers: hours worked and cost
-
Posted an entry on Glen-L Squirt
Interior work No. 4
-
Posted an entry on Glen-L Squirt
Designing and building the dashboard and control box
-
Posted an entry on Glen-L Squirt
Building a dolly for the outboard
-
Posted an entry on Glen-L Squirt
Buying the outboard
-
Posted an entry on Glen-L Squirt
Interior work No. 3
-
Posted an entry on Glen-L Squirt
Finishing the hull, and painting (first attempt)
-
Posted an entry on Glen-L Squirt
Interior work No. 2
-
Posted an entry on Glen-L Squirt
Designing and building the seat
-
Posted an entry on Glen-L Squirt
First work on the inside
-
Posted an entry on Glen-L Squirt
Hull work and fiberglassing
-
Posted an entry on Glen-L Squirt
Planking the hull in plywood
-
Posted an entry on Glen-L Squirt
Fairing the framework
-
Posted an entry on Glen-L Squirt
Steam bending and gluing the chines and sheers
-
Posted an entry on Glen-L Squirt
Building the strongback, and setting up the frames, transom and keel
-
Posted an entry on Glen-L Squirt
Building the frames, keel and transom
-
Posted an entry on Glen-L Squirt
Choosing the boat, and getting ready