boatbuildlog

The Guider · step

Glassing & Epoxy

Sheathing in cloth, wetting out, fill coats.

Glassing & Epoxy on every boat, not just the The Guider →

1
Builders
1
Entries
n/a
Median hours

What followed was a lengthy process of saturating, fiberglassing, fairing, sanding the hull (so MUCH sanding, so MUCH DUST). Everything on this boat will be painted because I loathe varnishing. The only thing I did differently from the CLC instructions was to put lengths of Kevlar tape at the bow and stern for increased abrasion resistance. This process required about 6 weeks of work (June 15th - Aug 23rd).

Read in context →