boatbuildlog

Spartan II · step

Rig & Spars

Mast, boom, standing and running rigging, sails.

Rig & Spars on every boat, not just the Spartan II →

1
Builders
8
Entries
22.5
Median hours

When Arnt bought his 23' gaff cutter ANJA, it had a solid fir mast that was smaller in diameter than designed in the plans. Finding it much too flexible, he build a new one, and hung this one up in rafters of his shop. We took it down and scraped off all the paint to see if it would work for our new boat.

Read in context →

After stripping the paint off it looked like it might be ok. However, it seemed to be made up of many pieces, so we ripped it down the centre on the bandsaw to see what the structure was. There was some rot in the bottom where the tabernacle hinge bolt went through, but the scarfs looked fairly good if we put in a couple of dutchman repairs into the few spots we didn't like. The plans for this boat call for a hollow mast of Douglas fir, so this might be just the ticket!

Read in context →

Once we achieved the desired sidewall dimensions for the hollowed section, we routed out and epoxied in a few dutchmans to the iffy spots of the original build. And, we cut the rotten bottom off and put in a nice long 12:1 scarf to receive a new butt end.

Read in context →

Arnt had been wondering what to do with this old chunk of fir... it's now going to be the base of our mast. It's a bit heavier than ideal, hoping it doesn't ruin the righting moment too much.

Read in context →

You'll note there are no wires in the mast... I've decided to keep the boat systems as basic as can be, I'll hoist an anchor light when I need one, and judge the wind strength and direction by analog means.

Read in context →

As per our regular practice, we use West System epoxy... wet out all surfaces with neat; then add appropriate thickener, in this case #406 Colloidal Silica. Not too much clamping pressure so it doesn't squeeze everything out!

Read in context →

Photos by William C. Weaver IV... William dropped by to get a few shots of the build, and found us planing the mast down to approximate final dimensions (before rounding).

Read in context →

While waiting for the paint on the lofting plywood to dry, we spent about a hour rounding the mast. The area in the photo is where it will transition from the 8 sided base to round. Just starting that job, there will be more to do on it, later. But now, lunch, then to get on with the lofting (if the paint is dry).

Read in context →