boatbuildlog

13 Sport · restoration

Boston Whaler 13 — transom and foam

by Example Logs · boatbuildlog.com

An example log of the job every old Whaler eventually needs. Shows a restoration where the boat is structurally sound but waterlogged.

This is an example log, not a real project. It exists to show what a useful build log looks like — dated entries, tagged to a step, with hours recorded and mistakes written down. The technique in it is illustrative; don’t follow it as instruction, and check anything structural against your designer’s drawings. Its hours are excluded from the site’s median figures.
4
Entries
31
Hours
98
Days elapsed
4
Photos
Jan 2026
Started
Hull & Plank Repair 9 h

Drying the foam

Drilled a grid of drain holes and left it in the sun for six weeks, weighing it fortnightly.

Still to do: new core bonded in, reglass, then fairing and paint.

Illustration — example log, not a photograph.
Illustration — example log, not a photograph.