-
Published the build log Glen-L Hot Rod
-
Posted an entry on Glen-L Hot Rod
Latest update : We've recovered from our cardiac issues and getting back into our truck camping and boating trips
-
Posted an entry on Glen-L Hot Rod
Since there was a possibility of building more than one boat in the future, we produced a set of frame templates to impr
-
Posted an entry on Glen-L Hot Rod
Latest Updates It has been a while since our last update !
-
Posted an entry on Glen-L Hot Rod
The boat has been reassembled and is back on the water !
-
Posted an entry on Glen-L Hot Rod
At the Glen-L Boatbuilder Gathering, Lake Nickajack, Tennessee
-
Posted an entry on Glen-L Hot Rod
It's been a long time since our last update
-
Posted an entry on Glen-L Hot Rod
One of the last interior jobs is to finish up the front cockpit seating
-
Posted an entry on Glen-L Hot Rod
Fuel tank cradles are ready to install
-
Posted an entry on Glen-L Hot Rod
We extended the radiused corner coamings to the the rear jump seat backs
-
Posted an entry on Glen-L Hot Rod
Gauges were installed over the weekend and are ready for wiring
-
Posted an entry on Glen-L Hot Rod
Work on the front cockpit carlings and dash continues
-
Posted an entry on Glen-L Hot Rod
We're finally trial fitting the deck panels
-
Posted an entry on Glen-L Hot Rod
The original Carter 3660 carburetor was upgraded to a Holley 600 CFM marine four barrel carburetor
-
Posted an entry on Glen-L Hot Rod
Several days (and kilometers) later
-
Posted an entry on Glen-L Hot Rod
We've been working away at the boat over the winter but haven't much to show so far
-
Posted an entry on Glen-L Hot Rod
Time spent building the gantry was well worth it
-
Posted an entry on Glen-L Hot Rod
Moving the boat from its cradle to the trailer went extremely well
-
Posted an entry on Glen-L Hot Rod
The Hardin Marine thermostat housing required us to re-plumb most of the engine plumbing
-
Posted an entry on Glen-L Hot Rod
All mounting plates were sandblasted, primed and painted before final assembly
-
Posted an entry on Glen-L Hot Rod
The driver's seat is nearing completion
-
Posted an entry on Glen-L Hot Rod
The intermediate deck beam straddles the carlings at frame # 4
-
Posted an entry on Glen-L Hot Rod
Here's the day I've been waiting for !
-
Posted an entry on Glen-L Hot Rod
Here's the last of the mechanical components being painted
-
Posted an entry on Glen-L Hot Rod
Here's a good friend of mine, Colin, rebuilding the v-drive
-
Posted an entry on Glen-L Hot Rod
Time flies when you're having fun !
-
Posted an entry on Glen-L Hot Rod
Steve at Ayling's Boat Yard has been busy in the machine shop refining the steering components
-
Posted an entry on Glen-L Hot Rod
Under-deck flotation billets were cast and installed
-
Posted an entry on Glen-L Hot Rod
We'll be installing a stainless steel pop-up bow light in the strongback
-
Posted an entry on Glen-L Hot Rod
Here's the last of the interior epoxy barrier coating