  1. Posted an entry on Glen-L Hot Rod

    We fabricated a frame truss plate to span the stuffing box at frame # 4

  2. Posted an entry on Glen-L Hot Rod

    The transom drain plugs were cut out with a hole saw

  3. Posted an entry on Glen-L Hot Rod

    Over the weekend, we installed the oil pan, remote oil filter relocation kit, dipstick tube and the newly painted altern

  4. Posted an entry on Glen-L Hot Rod

    At last !

  5. Posted an entry on Glen-L Hot Rod

    Welded joints were silver-soldered and the oil pan was tested for leaks

  6. Posted an entry on Glen-L Hot Rod

    While we're waiting for the last wood order to arrive (Douglas Fir for the carlings and intermediate deck beams), we pre

  7. Posted an entry on Glen-L Hot Rod

    The breasthook was notched to a depth of 3/8"

  8. Posted an entry on Glen-L Hot Rod

    Work on barrier coating the interior of the hull continues

  9. Posted an entry on Glen-L Hot Rod

    We're currently fabricating removable foam flotation panels which will be installed under the deck battens

  10. Posted an entry on Glen-L Hot Rod

    We've added kickouts to the rear sump and added a new sump at the front

  11. Posted an entry on Glen-L Hot Rod

    The oil pan sump was cut to move the engine 1-1/2" aft and 2-1/2" lower

  12. Posted an entry on Glen-L Hot Rod

    The H joint was bolted up to the transmission flange

  13. Posted an entry on Glen-L Hot Rod

    Photo quality should improve drastically from this point on

  14. Posted an entry on Glen-L Hot Rod

    A heavy-duty mobile dolly was fabricated for the hull

  15. Posted an entry on Glen-L Hot Rod

    The shop was cleaned up, the painting tarps were hung on the walls and furnace filters were slipped into the rear screen

  16. Posted an entry on Glen-L Hot Rod

    On Friday night, the hull was washed with water and scuffed with a Scotch pad to remove sanding sludge

  17. Posted an entry on Glen-L Hot Rod

    We epoxied a fiberglass rudder port tube into the rudder port hole

  18. Posted an entry on Glen-L Hot Rod

    We applied the last three epoxy barrier coats on Saturday

  19. Posted an entry on Glen-L Hot Rod

    An extra layer of cloth was applied to the keel and the bow area

  20. Posted an entry on Glen-L Hot Rod

    The shaft tube was epoxied and trimmed

  21. Posted an entry on Glen-L Hot Rod

    We're applying the fiberglass cloth using the 'dry method'

  22. Posted an entry on Glen-L Hot Rod

    Took Friday off to feather the overlaps and sand the hull with 40 grit sandpaper

  23. Posted an entry on Glen-L Hot Rod

    Over the long weekend, we laminated three strips of fiberglass cloth on the chine and transom edges and ground them to a

  24. Posted an entry on Glen-L Hot Rod

    A strut pad was laminated from 3 layers of 1-1/2 ounce fiberglass mat

  25. Posted an entry on Glen-L Hot Rod

    Screw holes were puttied with Interlux Watertite YAV135

  26. Posted an entry on Glen-L Hot Rod

    On Friday night we fiberglassed the starboard bottom

  27. Posted an entry on Glen-L Hot Rod

    Fitting the port second bottom

  28. Posted an entry on Glen-L Hot Rod

    Both second bottom panels installed

  29. Posted an entry on Glen-L Hot Rod

    Starboard side

  30. Posted an entry on Glen-L Hot Rod

    Port side