Posted an entry on Glen-L Hot Rod
Port first bottom
-
Posted an entry on Glen-L Hot Rod
Port side first bottom ready to be epoxied
-
Posted an entry on Glen-L Hot Rod
Second bottom panels (1/4" marine grade plywood) were cut, scarfed and epoxied
-
Posted an entry on Glen-L Hot Rod
Prior to panel removal, keel, chine, batten, and butt block locations were traced with a pencil from inside the boat
-
Posted an entry on Glen-L Hot Rod
Butt blocks epoxied and clamped
-
Posted an entry on Glen-L Hot Rod
Plywood washers were used to increase the screw's clamping pressure
-
Posted an entry on Glen-L Hot Rod
Side planking was fastened with 1" #8 screws spaced 3" apart at the chine and 4" apart at the sheer
-
Posted an entry on Glen-L Hot Rod
Drainage limbers were cut into the rear battens
-
Posted an entry on Glen-L Hot Rod
The frame sides must be faired so that they don't project against the plywood planking
-
Posted an entry on Glen-L Hot Rod
Sheer fairing nearing completion
-
Posted an entry on Glen-L Hot Rod
Here's a shot of the last side planking scarf joint being epoxied
-
Posted an entry on Glen-L Hot Rod
Since the Bill Of Materials call for a single layer of 1/4" sheeting for the sides, we'll be using 1/4" 5-Ply Meranti ma
-
Posted an entry on Glen-L Hot Rod
Most of the first sheer lamination was faired away
-
Posted an entry on Glen-L Hot Rod
The strut was reinstalled and an 8' long piece of 1" round bar was slipped into it
-
Posted an entry on Glen-L Hot Rod
Two layers of 3/8" thick by 2" wide mahogany stock were laminated to the inside chine log surfaces
-
Posted an entry on Glen-L Hot Rod
A quick and accurate method of fairing the frames so they'll sit 1/8" below the battens involves running a router over t
-
Posted an entry on Glen-L Hot Rod
A fiberglass tube was inserted into the shaft hole
-
Posted an entry on Glen-L Hot Rod
A 1/8" masonite spacer was fabricated and slipped under the strut to simulate the thickness of two layers of fiberglass
-
Posted an entry on Glen-L Hot Rod
The propeller shaft hole will be drilled prior to sheeting the bottom
-
Posted an entry on Glen-L Hot Rod
Gluing the third sheer clamp laminations
-
Posted an entry on Glen-L Hot Rod
Gluing the second starboard-side sheer clamp lamination
-
Posted an entry on Glen-L Hot Rod
First bottom panels dry-fitted
-
Posted an entry on Glen-L Hot Rod
Installing the second sheer clamp lamination
-
Posted an entry on Glen-L Hot Rod
Port chine recessed for first bottom and battens glued
-
Posted an entry on Glen-L Hot Rod
Fitting the scarfed first bottom panel
-
Posted an entry on Glen-L Hot Rod
While we're waiting for the bottom panel to fully cure, the side planking template (31" wide x 18' long) is clamped in p
-
Posted an entry on Glen-L Hot Rod
The first bottom template (1/4" fir plywood) is screwed to a piece of 1/4" marine plywood and trimmed to size
-
Posted an entry on Glen-L Hot Rod
We'll be sheeting with the optional 1/2" botom in the flatter aft area and two layers of 1/4" in the forward section
-
Posted an entry on Glen-L Hot Rod
Installing the battens and fairing
-
Posted an entry on Glen-L Hot Rod
The second sheer clamp laminations are yet to be installed