  1. Posted an entry on Glen-L Hot Rod

    Port first bottom

  2. Posted an entry on Glen-L Hot Rod

    Port side first bottom ready to be epoxied

  3. Posted an entry on Glen-L Hot Rod

    Second bottom panels (1/4" marine grade plywood) were cut, scarfed and epoxied

  4. Posted an entry on Glen-L Hot Rod

    Prior to panel removal, keel, chine, batten, and butt block locations were traced with a pencil from inside the boat

  5. Posted an entry on Glen-L Hot Rod

    Butt blocks epoxied and clamped

  6. Posted an entry on Glen-L Hot Rod

    Plywood washers were used to increase the screw's clamping pressure

  7. Posted an entry on Glen-L Hot Rod

    Side planking was fastened with 1" #8 screws spaced 3" apart at the chine and 4" apart at the sheer

  8. Posted an entry on Glen-L Hot Rod

    Drainage limbers were cut into the rear battens

  9. Posted an entry on Glen-L Hot Rod

    The frame sides must be faired so that they don't project against the plywood planking

  10. Posted an entry on Glen-L Hot Rod

    Sheer fairing nearing completion

  11. Posted an entry on Glen-L Hot Rod

    Here's a shot of the last side planking scarf joint being epoxied

  12. Posted an entry on Glen-L Hot Rod

    Since the Bill Of Materials call for a single layer of 1/4" sheeting for the sides, we'll be using 1/4" 5-Ply Meranti ma

  13. Posted an entry on Glen-L Hot Rod

    Most of the first sheer lamination was faired away

  14. Posted an entry on Glen-L Hot Rod

    The strut was reinstalled and an 8' long piece of 1" round bar was slipped into it

  15. Posted an entry on Glen-L Hot Rod

    Two layers of 3/8" thick by 2" wide mahogany stock were laminated to the inside chine log surfaces

  16. Posted an entry on Glen-L Hot Rod

    A quick and accurate method of fairing the frames so they'll sit 1/8" below the battens involves running a router over t

  17. Posted an entry on Glen-L Hot Rod

    A fiberglass tube was inserted into the shaft hole

  18. Posted an entry on Glen-L Hot Rod

    A 1/8" masonite spacer was fabricated and slipped under the strut to simulate the thickness of two layers of fiberglass

  19. Posted an entry on Glen-L Hot Rod

    The propeller shaft hole will be drilled prior to sheeting the bottom

  20. Posted an entry on Glen-L Hot Rod

    Gluing the third sheer clamp laminations

  21. Posted an entry on Glen-L Hot Rod

    Gluing the second starboard-side sheer clamp lamination

  22. Posted an entry on Glen-L Hot Rod

    First bottom panels dry-fitted

  23. Posted an entry on Glen-L Hot Rod

    Installing the second sheer clamp lamination

  24. Posted an entry on Glen-L Hot Rod

    Port chine recessed for first bottom and battens glued

  25. Posted an entry on Glen-L Hot Rod

    Fitting the scarfed first bottom panel

  26. Posted an entry on Glen-L Hot Rod

    While we're waiting for the bottom panel to fully cure, the side planking template (31" wide x 18' long) is clamped in p

  27. Posted an entry on Glen-L Hot Rod

    The first bottom template (1/4" fir plywood) is screwed to a piece of 1/4" marine plywood and trimmed to size

  28. Posted an entry on Glen-L Hot Rod

    We'll be sheeting with the optional 1/2" botom in the flatter aft area and two layers of 1/4" in the forward section

  29. Posted an entry on Glen-L Hot Rod

    Installing the battens and fairing

  30. Posted an entry on Glen-L Hot Rod

    The second sheer clamp laminations are yet to be installed