  1. Posted an entry on Glen-L Hot Rod

    Moving the boat from its cradle to the trailer went extremely well

  2. Posted an entry on Glen-L Hot Rod

    The Hardin Marine thermostat housing required us to re-plumb most of the engine plumbing

  3. Posted an entry on Glen-L Hot Rod

    All mounting plates were sandblasted, primed and painted before final assembly

  4. Posted an entry on Glen-L Hot Rod

    The driver's seat is nearing completion

  5. Posted an entry on Glen-L Hot Rod

    The intermediate deck beam straddles the carlings at frame # 4

  6. Posted an entry on Glen-L Hot Rod

    Here's the day I've been waiting for !

  7. Posted an entry on Glen-L Hot Rod

    Here's a good friend of mine, Colin, rebuilding the v-drive

  8. Posted an entry on Glen-L Hot Rod

    Here's the last of the mechanical components being painted

  9. Posted an entry on Glen-L Hot Rod

    Time flies when you're having fun !

  10. Posted an entry on Glen-L Hot Rod

    Under-deck flotation billets were cast and installed

  11. Posted an entry on Glen-L Hot Rod

    Steve at Ayling's Boat Yard has been busy in the machine shop refining the steering components

  12. Posted an entry on Glen-L Hot Rod

    Here's the last of the interior epoxy barrier coating

  13. Posted an entry on Glen-L Hot Rod

    We fabricated a frame truss plate to span the stuffing box at frame # 4

  14. Posted an entry on Glen-L Hot Rod

    We'll be installing a stainless steel pop-up bow light in the strongback

  15. Posted an entry on Glen-L Hot Rod

    The transom drain plugs were cut out with a hole saw

  16. Posted an entry on Glen-L Hot Rod

    Welded joints were silver-soldered and the oil pan was tested for leaks

  17. Posted an entry on Glen-L Hot Rod

    At last !

  18. Posted an entry on Glen-L Hot Rod

    Over the weekend, we installed the oil pan, remote oil filter relocation kit, dipstick tube and the newly painted altern

  19. Posted an entry on Glen-L Hot Rod

    The breasthook was notched to a depth of 3/8"

  20. Posted an entry on Glen-L Hot Rod

    While we're waiting for the last wood order to arrive (Douglas Fir for the carlings and intermediate deck beams), we pre

  21. Posted an entry on Glen-L Hot Rod

    The oil pan sump was cut to move the engine 1-1/2" aft and 2-1/2" lower

  22. Posted an entry on Glen-L Hot Rod

    We've added kickouts to the rear sump and added a new sump at the front

  23. Posted an entry on Glen-L Hot Rod

    We're currently fabricating removable foam flotation panels which will be installed under the deck battens

  24. Posted an entry on Glen-L Hot Rod

    Work on barrier coating the interior of the hull continues

  25. Posted an entry on Glen-L Hot Rod

    The H joint was bolted up to the transmission flange

  26. Posted an entry on Glen-L Hot Rod

    Photo quality should improve drastically from this point on

  27. Posted an entry on Glen-L Hot Rod

    A heavy-duty mobile dolly was fabricated for the hull

  28. Posted an entry on Glen-L Hot Rod

    On Friday night, the hull was washed with water and scuffed with a Scotch pad to remove sanding sludge

  29. Posted an entry on Glen-L Hot Rod

    The shop was cleaned up, the painting tarps were hung on the walls and furnace filters were slipped into the rear screen

  30. Posted an entry on Glen-L Hot Rod

    We epoxied a fiberglass rudder port tube into the rudder port hole