boatbuildlog
  1. Posted an entry on Glen-L Hot Rod

    We applied the last three epoxy barrier coats on Saturday

  2. Posted an entry on Glen-L Hot Rod

    An extra layer of cloth was applied to the keel and the bow area

  3. Posted an entry on Glen-L Hot Rod

    The shaft tube was epoxied and trimmed

  4. Posted an entry on Glen-L Hot Rod

    We're applying the fiberglass cloth using the 'dry method'

  5. Posted an entry on Glen-L Hot Rod

    Took Friday off to feather the overlaps and sand the hull with 40 grit sandpaper

  6. Posted an entry on Glen-L Hot Rod

    Over the long weekend, we laminated three strips of fiberglass cloth on the chine and transom edges and ground them to a

  7. Posted an entry on Glen-L Hot Rod

    A strut pad was laminated from 3 layers of 1-1/2 ounce fiberglass mat

  8. Posted an entry on Glen-L Hot Rod

    Screw holes were puttied with Interlux Watertite YAV135

  9. Posted an entry on Glen-L Hot Rod

    On Friday night we fiberglassed the starboard bottom

  10. Posted an entry on Glen-L Hot Rod

    Fitting the port second bottom

  11. Posted an entry on Glen-L Hot Rod

    Both second bottom panels installed

  12. Posted an entry on Glen-L Hot Rod

    Port first bottom

  13. Posted an entry on Glen-L Hot Rod

    Starboard side

  14. Posted an entry on Glen-L Hot Rod

    Port side

  15. Posted an entry on Glen-L Hot Rod

    Prior to panel removal, keel, chine, batten, and butt block locations were traced with a pencil from inside the boat

  16. Posted an entry on Glen-L Hot Rod

    Port side first bottom ready to be epoxied

  17. Posted an entry on Glen-L Hot Rod

    Second bottom panels (1/4" marine grade plywood) were cut, scarfed and epoxied

  18. Posted an entry on Glen-L Hot Rod

    Butt blocks epoxied and clamped

  19. Posted an entry on Glen-L Hot Rod

    Plywood washers were used to increase the screw's clamping pressure

  20. Posted an entry on Glen-L Hot Rod

    Side planking was fastened with 1" #8 screws spaced 3" apart at the chine and 4" apart at the sheer

  21. Posted an entry on Glen-L Hot Rod

    Drainage limbers were cut into the rear battens

  22. Posted an entry on Glen-L Hot Rod

    The frame sides must be faired so that they don't project against the plywood planking

  23. Posted an entry on Glen-L Hot Rod

    Sheer fairing nearing completion

  24. Posted an entry on Glen-L Hot Rod

    Most of the first sheer lamination was faired away

  25. Posted an entry on Glen-L Hot Rod

    Since the Bill Of Materials call for a single layer of 1/4" sheeting for the sides, we'll be using 1/4" 5-Ply Meranti ma

  26. Posted an entry on Glen-L Hot Rod

    Here's a shot of the last side planking scarf joint being epoxied

  27. Posted an entry on Glen-L Hot Rod

    The strut was reinstalled and an 8' long piece of 1" round bar was slipped into it

  28. Posted an entry on Glen-L Hot Rod

    Two layers of 3/8" thick by 2" wide mahogany stock were laminated to the inside chine log surfaces

  29. Posted an entry on Glen-L Hot Rod

    A quick and accurate method of fairing the frames so they'll sit 1/8" below the battens involves running a router over t

  30. Posted an entry on Glen-L Hot Rod

    A fiberglass tube was inserted into the shaft hole