  1. Posted an entry on Glen-L Hot Rod

    A 1/8" masonite spacer was fabricated and slipped under the strut to simulate the thickness of two layers of fiberglass

  2. Posted an entry on Glen-L Hot Rod

    Gluing the second starboard-side sheer clamp lamination

  3. Posted an entry on Glen-L Hot Rod

    Gluing the third sheer clamp laminations

  4. Posted an entry on Glen-L Hot Rod

    The propeller shaft hole will be drilled prior to sheeting the bottom

  5. Posted an entry on Glen-L Hot Rod

    First bottom panels dry-fitted

  6. Posted an entry on Glen-L Hot Rod

    Installing the second sheer clamp lamination

  7. Posted an entry on Glen-L Hot Rod

    Port chine recessed for first bottom and battens glued

  8. Posted an entry on Glen-L Hot Rod

    Fitting the scarfed first bottom panel

  9. Posted an entry on Glen-L Hot Rod

    While we're waiting for the bottom panel to fully cure, the side planking template (31" wide x 18' long) is clamped in p

  10. Posted an entry on Glen-L Hot Rod

    The first bottom template (1/4" fir plywood) is screwed to a piece of 1/4" marine plywood and trimmed to size

  11. Posted an entry on Glen-L Hot Rod

    Installing the battens and fairing

  12. Posted an entry on Glen-L Hot Rod

    We'll be sheeting with the optional 1/2" botom in the flatter aft area and two layers of 1/4" in the forward section

  13. Posted an entry on Glen-L Hot Rod

    A large crescent wrench and a ratchet strap was used to twist the top of the chine inward towards the keel

  14. Posted an entry on Glen-L Hot Rod

    The second sheer clamp laminations are yet to be installed

  15. Posted an entry on Glen-L Hot Rod

    Fitting the chine

  16. Posted an entry on Glen-L Hot Rod

    Installing the sheer clamps

  17. Posted an entry on Glen-L Hot Rod

    Transom bracket painted and installed

  18. Posted an entry on Glen-L Hot Rod

    Frame clips were fabricated from 1-1/2" angle iron

  19. Posted an entry on Glen-L Hot Rod

    All pieces trimmed on the router table equipped with a top-bearing flush trim bit

  20. Posted an entry on Glen-L Hot Rod

    Frame and floor timber assembly completed

  21. Posted an entry on Glen-L Hot Rod

    The templates for the bottom frames, laminations and floor timbers were screwed to Douglas Fir stock and cut on the band

  22. Launched Glen-L Hot Rod