O'Day Daysailer restoration

by Example Logs · boatbuildlog.com

An example restoration log. Shows how a restoration diverges from a new build: survey and teardown first, and a scope that grows once you open things up.

This is an example log, not a real project. It exists to show what a useful build log looks like — dated entries, tagged to a step, with hours recorded and mistakes written down. The technique in it is illustrative; don’t follow it as instruction, and check anything structural against your designer’s drawings. Its hours are excluded from the site’s median figures.
5
Entries
48
Hours
168
Days elapsed
5
Photos
Apr 2025
Started
Gelcoat & Glass Repair 10 h

Blisters and crazing

Ground out blisters, filled, faired the topsides. Crazing round the old cleat bases came out with the hardware.

Still to do: paint, then rig and hardware. Roughly 48 hours in so far against an estimate of 30.