O'Day Daysailer · restoration

O'Day Daysailer restoration

by Example Logs · boatbuildlog.com

An example restoration log. Shows how a restoration diverges from a new build: survey and teardown first, and a scope that grows once you open things up.

This is an example log, not a real project. It exists to show what a useful build log looks like — dated entries, tagged to a step, with hours recorded and mistakes written down. The technique in it is illustrative; don’t follow it as instruction, and check anything structural against your designer’s drawings. Its hours are excluded from the site’s median figures.
5
Entries
48
Hours
168
Days elapsed
5
Photos
Apr 2025
Started
Hull & Plank Repair 11 h

Centreboard trunk

Old sealant had failed along the trunk. Ground out, reglassed, faired.

Slow, awkward, upside-down work. Two hours at a time was my limit.

Illustration — example log, not a photograph.
Illustration — example log, not a photograph.