Giveaway: refer the most builders by October 30 and win your pick from the store. How it works
boatbuildlog

Paper Jet 14 · new build

Paper Jet 14 Build UK

First boat, single garage and garden, at weekends and evenings only

Make a book Feed The whole log, 6 entries and every photo, laid out as a book to print, bind and keep.
6
Entries
86
Hours
142
Days elapsed
89
Photos
May 2026
Started
Rig & Spars 24 h Link

Spars begin

Started with spar construction due to kit lead time and outdoor availability. Generally went well. I changed the 2mm radii reduction to 3mm for the mast joiner. I changed the lower mast section to be round until after the gooseneck. I would not use roving as a wrap but twill weave instead for the sprit. If I were to start over, Id add a core to the short top mast for a gennaker block (might fill with epoxy foam or make another short top mast). Instructions are very clear but leave a little to work with for ingenuity. Having a planer would make the spars far easier than just a table saw and thicknesser.

1 Paper Jet 14: Spars begin
2 Paper Jet 14: Spars begin
3 Paper Jet 14: Spars begin
4 Paper Jet 14: Spars begin
5 Paper Jet 14: Spars begin
6 Paper Jet 14: Spars begin
7 Paper Jet 14: Spars begin
8 Paper Jet 14: Spars begin
9 Paper Jet 14: Spars begin
10 Paper Jet 14: Spars begin
11 Paper Jet 14: Spars begin
12 Paper Jet 14: Spars begin
13 Paper Jet 14: Spars begin
14 Paper Jet 14: Spars begin
15 Paper Jet 14: Spars begin
16 Paper Jet 14: Spars begin
17 Paper Jet 14: Spars begin
18 Paper Jet 14: Spars begin
19 Paper Jet 14: Spars begin
20 Paper Jet 14: Spars begin
21 Paper Jet 14: Spars begin
22 Paper Jet 14: Spars begin
23 Paper Jet 14: Spars begin
24 Paper Jet 14: Spars begin
Rig & Spars 24 h Link

Spars continue

Continuation of photo backlog for this build with mast construction, scarfing, tube fitment for hardware, rebate for mast tube joiner, Epoxy work and sanding. Lots of sanding....

1 Paper Jet 14: Spars continue
2 Paper Jet 14: Spars continue
3 Paper Jet 14: Spars continue
4 Paper Jet 14: Spars continue
5 Paper Jet 14: Spars continue
6 Paper Jet 14: Spars continue
7 Paper Jet 14: Spars continue
8 Paper Jet 14: Spars continue
9 Paper Jet 14: Spars continue
10 Paper Jet 14: Spars continue
11 Paper Jet 14: Spars continue
12 Paper Jet 14: Spars continue
13 Paper Jet 14: Spars continue
14 Paper Jet 14: Spars continue
15 Paper Jet 14: Spars continue
16 Paper Jet 14: Spars continue
17 Paper Jet 14: Spars continue
18 Paper Jet 14: Spars continue
19 Paper Jet 14: Spars continue
20 Paper Jet 14: Spars continue
21 Paper Jet 14: Spars continue
22 Paper Jet 14: Spars continue
23 Paper Jet 14: Spars continue
24 Paper Jet 14: Spars continue
Rig & Spars 24 h Link

Spars continued

Continuation of backlog from spar construction photos. I would not use roving to wrap the bowsprit but a lighter twill weave instead. It's almost transparent but not quite. The mast joiner that I made in above photos ended up too large by several mm and the masking tape stuck to the inside. I specified a mainsail for Selden series 2 sail track (7mm Dia bolt rope) which subsequently became hard to source. >6 week lead time and around £30/m. So I made sames of PVC tube inside profiled Poplar. Shown is 10mmID which is slightly large but easier to source than 9mmID (75m min order quantity). I was nervous of the bare PVC tube idea as another blog I read split the tube on first outing. Having made samples in 8mm, 9mm and 10mm ID. I would suggest bolt rope dia +2mm as an ideal starting point.

1 Paper Jet 14: Spars continued
2 Paper Jet 14: Spars continued
3 Paper Jet 14: Spars continued
4 Paper Jet 14: Spars continued
5 Paper Jet 14: Spars continued
6 Paper Jet 14: Spars continued
7 Paper Jet 14: Spars continued
8 Paper Jet 14: Spars continued
9 Paper Jet 14: Spars continued
10 Paper Jet 14: Spars continued
11 Paper Jet 14: Spars continued
12 Paper Jet 14: Spars continued
13 Paper Jet 14: Spars continued
14 Paper Jet 14: Spars continued
15 Paper Jet 14: Spars continued
16 Paper Jet 14: Spars continued
17 Paper Jet 14: Spars continued
18 Paper Jet 14: Spars continued
19 Paper Jet 14: Spars continued
20 Paper Jet 14: Spars continued
21 Paper Jet 14: Spars continued
22 Paper Jet 14: Spars continued
23 Paper Jet 14: Spars continued
24 Paper Jet 14: Spars continued
Rig & Spars 5 h Link

Mast Joiner

I made another mast joiner as the original was very sloppy (too large). I made a separate madrel from some spare pine and wrapped around it to 10" length then cut it down to 8" post cure. The ID profile is much better than the original and the ends did not taper due to the rebate step. I would use less material in future as there was a lot of post cure sanding. I'd probably start with really light (160g) glass twill to get the profile snug and let it part cure before applying approximately 2m of 200g carbon twill. Followed by 300mm of 160g glass twill or finishing cloth. Leave rear face down to set as the run off needed sanding round afterwards.

1 Paper Jet 14: Mast Joiner
2 Paper Jet 14: Mast Joiner
3 Paper Jet 14: Mast Joiner
Rig & Spars 6 h Link

Mast joining tube finishing work

Mast rebate trimming to fit new joining tube. Followed by joining tube sanding to match mast profile. I would first epoxy coat the main mast before sanding the carbon tube as the black dust was hard to remove from bare wood.

1 Paper Jet 14: Mast joining tube finishing work
2 Paper Jet 14: Mast joining tube finishing work
3 Paper Jet 14: Mast joining tube finishing work
4 Paper Jet 14: Mast joining tube finishing work
5 Paper Jet 14: Mast joining tube finishing work
6 Paper Jet 14: Mast joining tube finishing work
7 Paper Jet 14: Mast joining tube finishing work
8 Paper Jet 14: Mast joining tube finishing work

Nobody else here is logging a Paper Jet 14 yet. See the boat.