An example log following a first-time builder through a stitch-and-glue kayak over seven months of weekends. Shows how much detail is worth recording.
This is an example log, not a real project.
It exists to show what a useful build log looks like — dated entries, tagged to a step,
with hours recorded and mistakes written down. The technique in it is illustrative;
don’t follow it as instruction, and check anything structural against your
designer’s drawings. Its hours are excluded from the site’s median figures.
The moment it stops being a pile of plywood. Took most of a Saturday.
Wire tension is the whole job — too tight and the panels distort, too loose and the seams open. I went round three times adjusting before I was happy with the sheerline.
Cloth over the whole exterior, wetted out, then two fill coats over the following week.
Got blush on the first fill coat because I recoated too late. Had to wash and sand it back. Read the epoxy manufacturer's recoat window and set a timer.
Sixteen hours across three weekends and it is still not perfect.
This is the step everyone under-photographs and under-estimates. Longboard, low-angle light, and accept that you will find another low spot every time you look.