boatbuildlog

Shearwater 17 · new build

Launched

Shearwater 17 in a one-car garage

by Example Logs · boatbuildlog.com

An example log following a first-time builder through a stitch-and-glue kayak over seven months of weekends. Shows how much detail is worth recording.

This is an example log, not a real project. It exists to show what a useful build log looks like — dated entries, tagged to a step, with hours recorded and mistakes written down. The technique in it is illustrative; don’t follow it as instruction, and check anything structural against your designer’s drawings. Its hours are excluded from the site’s median figures.
10
Entries
86
Hours
217
Days elapsed
10
Photos
Jan 2025
Started
Stitch & Assembly 9 h

Wired the hull together

The moment it stops being a pile of plywood. Took most of a Saturday.

Wire tension is the whole job — too tight and the panels distort, too loose and the seams open. I went round three times adjusting before I was happy with the sheerline.

Illustration — example log, not a photograph.
Illustration — example log, not a photograph.