Paint & Finish
12 h
Varnish schedule
Six coats of varnish, sanding between. Deck bright, hull painted.
Dust is the enemy. Wet the floor before each coat and stop opening the garage door.
Shearwater 17 · new build
LaunchedAn example log following a first-time builder through a stitch-and-glue kayak over seven months of weekends. Shows how much detail is worth recording.
Six coats of varnish, sanding between. Deck bright, hull painted.
Dust is the enemy. Wet the floor before each coat and stop opening the garage door.