Things are shaping up
Attaching the shear clamps, chines and battens was a slightly challenging due to the white oak.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
See Hull Exterior on other boats →
Attaching the shear clamps, chines and battens was a slightly challenging due to the white oak.
Attaching the mahogany plywood was the biggest challenge to date. Several towels soaked in boiling water were need to get the plywood flexible enough to shape to the frame. Besides clamps I had to use cargo ratchet straps to help get the panels in the right positions. It took several days to get it all positioned, glued and nailed to the frames. Last panel attached and a whiskey to celebrate.
Adding some design to the hull and the outer keel. any exposed plywood edges were covered using mahogany veneer.
The same boat, in somebody else's shop.