boatbuildlog

Malahini · new build

Malahini project

2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.

Make a book Feed The whole log, 3 entries and every photo, laid out as a book to print, bind and keep.
22
Entries
110
Hours
698
Days elapsed
75
Photos
Jul 2024
Started

See Hull Exterior on other boats →

Hull Exterior · other boats Link

Things are shaping up

Attaching the shear clamps, chines and battens was a slightly challenging due to the white oak.

1 Malahini: Things are shaping up
2 Malahini: Things are shaping up
3 Malahini: Things are shaping up
4 Malahini: Things are shaping up
Hull Exterior · other boats 14 h Link

Attaching the panels to form the hull

Attaching the mahogany plywood was the biggest challenge to date. Several towels soaked in boiling water were need to get the plywood flexible enough to shape to the frame. Besides clamps I had to use cargo ratchet straps to help get the panels in the right positions. It took several days to get it all positioned, glued and nailed to the frames. Last panel attached and a whiskey to celebrate.

1 Malahini: Attaching the panels to form the hull
2 Malahini: Attaching the panels to form the hull
3 Malahini: Attaching the panels to form the hull
4 Malahini: Attaching the panels to form the hull
5 Malahini: Attaching the panels to form the hull
6 Malahini: Attaching the panels to form the hull
7 Malahini: Attaching the panels to form the hull
8 Malahini: Attaching the panels to form the hull
9 Malahini: Attaching the panels to form the hull
Hull Exterior · other boats 8 h Link

Final shaping and outer keel work

Adding some design to the hull and the outer keel. any exposed plywood edges were covered using mahogany veneer.

1 Malahini: Final shaping and outer keel work
2 Malahini: Final shaping and outer keel work
3 Malahini: Final shaping and outer keel work

Others building the Malahini

The same boat, in somebody else's shop.

All Malahini logs, with the medians