boatbuildlog

Malahini · new build

Malahini project

2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.

Make a book Feed The whole log, 19 entries and every photo, laid out as a book to print, bind and keep.
19
Entries
94
Hours
536
Days elapsed
68
Photos
Jul 2024
Started
4 h Link

The Journey Begins

The start of the build. The plans are laid out and studied. The 1st step was to build the plywood support pieces.

1 Malahini: The Journey Begins
2 Malahini: The Journey Begins
3 Malahini: The Journey Begins
4 Malahini: The Journey Begins
Planning & Research · other boats 6 h Link

The search for lumber

Gathering lumber was a journey in itself. It was not easy to find white oak and mahogany at an affordable price in the retail stores. So I found a man in Lincoln Nebraska that had salvage out and old library room made with mahogany. I found another man outside of Des Moines Iowa milling his own lumber to include white oak.

1 Malahini: The search for lumber
2 Malahini: The search for lumber
Shop & Tooling · other boats 6 h Link

Frames

The frames were built in my basement workshop. Everything went well with the plans, layout and assembling the frames.

1 Malahini: Frames
2 Malahini: Frames
3 Malahini: Frames
Strongback & Molds · compare · other boats 16 h Link

Framing it up

Time to move out of the workshop and into the garage. Building the strongback and aligning the frames took a couple of days to complete. The strongback was screwed to the floor to minimize movement.

1 Malahini: Framing it up
2 Malahini: Framing it up
3 Malahini: Framing it up
Shop & Tooling · other boats 3 h Link

Transom work

Cutting out the transom. I cut it out to accommodate a 15" motor shaft. Later in the build I will need to change the cut out to fit a 20" shaft. It is difficult to find 15" shaft boat motors in my area.

1 Malahini: Transom work
2 Malahini: Transom work

Others building the Malahini

The same boat, in somebody else's shop.

All Malahini logs, with the medians