The Journey Begins
The start of the build. The plans are laid out and studied. The 1st step was to build the plywood support pieces.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
The start of the build. The plans are laid out and studied. The 1st step was to build the plywood support pieces.
Gathering lumber was a journey in itself. It was not easy to find white oak and mahogany at an affordable price in the retail stores. So I found a man in Lincoln Nebraska that had salvage out and old library room made with mahogany. I found another man outside of Des Moines Iowa milling his own lumber to include white oak.
The frames were built in my basement workshop. Everything went well with the plans, layout and assembling the frames.
Time to move out of the workshop and into the garage. Building the strongback and aligning the frames took a couple of days to complete. The strongback was screwed to the floor to minimize movement.
Cutting out the transom. I cut it out to accommodate a 15" motor shaft. Later in the build I will need to change the cut out to fit a 20" shaft. It is difficult to find 15" shaft boat motors in my area.
The same boat, in somebody else's shop.