Frames
The frames were built in my basement workshop. Everything went well with the plans, layout and assembling the frames.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
See Shop & Tooling on other boats →
The frames were built in my basement workshop. Everything went well with the plans, layout and assembling the frames.
Cutting out the transom. I cut it out to accommodate a 15" motor shaft. Later in the build I will need to change the cut out to fit a 20" shaft. It is difficult to find 15" shaft boat motors in my area.
The keel was built in the basement workshop. Lots of clamps needed for this piece.
The same boat, in somebody else's shop.