boatbuildlog

Malahini · new build

Malahini project

2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.

Make a book Feed The whole log, 3 entries and every photo, laid out as a book to print, bind and keep.
22
Entries
110
Hours
698
Days elapsed
75
Photos
Jul 2024
Started

See Shop & Tooling on other boats →

Shop & Tooling · other boats 6 h Link

Frames

The frames were built in my basement workshop. Everything went well with the plans, layout and assembling the frames.

1 Malahini: Frames
2 Malahini: Frames
3 Malahini: Frames
Shop & Tooling · other boats 3 h Link

Transom work

Cutting out the transom. I cut it out to accommodate a 15" motor shaft. Later in the build I will need to change the cut out to fit a 20" shaft. It is difficult to find 15" shaft boat motors in my area.

1 Malahini: Transom work
2 Malahini: Transom work
Shop & Tooling · other boats 4 h Link

Keel

The keel was built in the basement workshop. Lots of clamps needed for this piece.

Others building the Malahini

The same boat, in somebody else's shop.

All Malahini logs, with the medians