Framing it up
Time to move out of the workshop and into the garage. Building the strongback and aligning the frames took a couple of days to complete. The strongback was screwed to the floor to minimize movement.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
See Strongback & Molds on other boats →
Time to move out of the workshop and into the garage. Building the strongback and aligning the frames took a couple of days to complete. The strongback was screwed to the floor to minimize movement.
The same boat, in somebody else's shop.