Deck hardware
I began installing various deck hardware components, including cleats, chocks, and the anchor pulpit. The main horn cleats, fore and aft, as well as the anchor pulpit, are through-bolted on the deck. They are bedded with 3M 4200 marine silicone sealant. The chocks are screwed into the sheer clamp and bedded with Dolphinite.
Shaping the centerboard blank
CLC supplies a 1/4" thick Aluminum centerboard blank, cut to shape, with a pre-drilled pivot hole. The build manual lays out how the tapers should be done to give the centerboard the proper hydrodynamics. The only problem was I had no clue how to work the aluminum. I tried to find a machine shop to do it, but it was too small a job and had too long a lead time. I ended up doing it myself with a cheap angle grinder (which died), a shinto rasp (an amazing tool), files, and a random orbital sander. I took the surface to 600 grit to make it nice and smooth. Elapsed time on the job was about 6 hours, spread over two days.
Building gantries. It flies!
The CLC build manual says the centerboard should slide into place from above. Either I did something wrong in construction, or they were dreaming. There was no way it was going in from above. I thought about what to do for a long time. Early in the build, I had friends over for flipping parties, but at this stage of the build it was a very different flip. The hull now weighed 500-600 lbs, and it would have to be carried out of the build space and rolled very carefully. I didn't like that option, so I built gantries to lift the boat and slide the centerboard in from underneath the hull. I also figured gantries would be a good way to get the boat on and off its trailer as needed. The gantries were built with construction-grade lumber from Home Despot and fitted with chain hoists and webbing from Harbor Freight. In the end, they were a success. At this point I had no idea if the boat would float but it definitely could fly!