Trailer prep
Time to get a trailer ready for the boat flip in a few weeks. Trailer was purchased for $400 and needed to be repainted and cleaned up.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
Time to get a trailer ready for the boat flip in a few weeks. Trailer was purchased for $400 and needed to be repainted and cleaned up.
Lots of sanding between epoxy applications and spar urethane. I ended with 3 coats of each. Another coat of urethane near the end of the build is planned.
The boat flip took a lot of manpower. I was lucky enough to have friends and neighbors willing to help me turn it over.
To be able to work on the inside, I wanted a floor structure installed. I am changing the recommended 3/8" plywood flooring to 3/4" marine grade plywood. I didn't feel comfortable with the flex in a 3/8" sheet. Adding the heavier sheet means that the weight will increase and I needed to be mindful of the designs plan for up to a 85 hp outboard motor. With the added weight for the floor structure I'm planning on a 60 - 75 hp outboard.
Framing up the deck support.
The same boat, in somebody else's shop.