boatbuildlog

Malahini · new build

Malahini project

2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.

Make a book Feed The whole log, 22 entries and every photo, laid out as a book to print, bind and keep.
22
Entries
110
Hours
698
Days elapsed
75
Photos
Jul 2024
Started
Interior & Cockpit · other boats Link

Dash board work

I couldn't find any mahogany wide enough for the dash that was priced reasonably. So I resorted to a glue up using biscuit joint technique.

Interior & Cockpit · other boats 2 h Link

Dash install

Installing the dash was challenging to get the cuts right for the carling. The holes for instruments and steering have not been cut yet. That will be decided later after the outboard and the controls for it are purchased.

Interior & Cockpit · other boats 8 h Link

Rear deck and motor well

Framing up the rear deck and motor well area.

1 Malahini: Rear deck and motor well
2 Malahini: Rear deck and motor well
3 Malahini: Rear deck and motor well
Glassing & Epoxy · other boats 4 h Link

Motor well seal

Epoxy seal for the motor well

1 Malahini: Motor well seal
2 Malahini: Motor well seal
3 Malahini: Motor well seal
Glassing & Epoxy · other boats 7 h Link

Waterproof the inside of the hull

It's time to seal up the floor and sub structure. I used 3 coats of epoxy for a solid seal up.

1 Malahini: Waterproof the inside of the hull
2 Malahini: Waterproof the inside of the hull
3 Malahini: Waterproof the inside of the hull

Others building the Malahini

The same boat, in somebody else's shop.

All Malahini logs, with the medians