Malahini · new build

Malahini project

2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.

Make a book Feed The whole log, 24 entries and every photo, laid out as a book to print, bind and keep.
24
Entries
119
Hours
703
Days elapsed
80
Photos
Jul 2024
Started
Glassing & Epoxy · other boats 2.5 h Link

Floor fitting and epoxy

Floor boards fitted and epoxy coated. Not screwed down yet. The electrical and fuel work chases need to be installed.

1 Malahini: Floor fitting and epoxy
2 Malahini: Floor fitting and epoxy
6 h Link

Floorboards

Fitting the floor for install.

1 Malahini: Floorboards
2 Malahini: Floorboards
6.5 h Link

Installing sub floor pipe chase

Installing PVC pipe for running electrical and fuel line under floor. After cutting the holes for the pipes I needed to go back and reseal the cuts with epoxy. The pipes were also epoxied in place.

1 Malahini: Installing sub floor pipe chase
2 Malahini: Installing sub floor pipe chase
Hardware & Fit-Out · other boats 3 h Link

Battery box work

Installation work for battery box. The platform the box sits on is also epoxied.

1 Malahini: Battery box work
2 Malahini: Battery box work
3 Malahini: Battery box work