Floor fitting and epoxy
Floor boards fitted and epoxy coated. Not screwed down yet. The electrical and fuel work chases need to be installed.
Malahini · new build
2nd boat build, 1st was a cedar strip canoe, planning on a kayak build after the Malahini.
Floor boards fitted and epoxy coated. Not screwed down yet. The electrical and fuel work chases need to be installed.
Fitting the floor for install.
Installing PVC pipe for running electrical and fuel line under floor. After cutting the holes for the pipes I needed to go back and reseal the cuts with epoxy. The pipes were also epoxied in place.
Installation work for battery box. The platform the box sits on is also epoxied.