Deck: Before epoxying the deck, we had to trim the flotation foam billets to clear our new bow l
1. Before epoxying the deck, we had to trim the flotation foam billets to clear our new bow light pod.
2. To ensure adequate ventilation and prevent rot issues, we installed 1-1/2" diameter 1/4" marine grade plywood spacers between the deck battens and foam bilets.
3. Billets are held in position by 1/4-20 stainless steel threaded rods and SS nyloc nuts. To see how the panels were fabricated, click here.