Weeks ago I found a compass on the dining table of a good friend. It seemed to belong to a boat but looked pretty lonesome without. I thought why not building a boat around it. That’s why I started to look for a suitable kit that meets my building abilities and could suit the compass. First of all I found the clc Skerry but finally decided to go for the Northeaster Dory.
So far I spent about 20 hours for preparation, ordering the kit or necessary material and tools. Sure, I had to get rid of some stuff to have enough space for the project. Finally I built a cart to be used instead of saw horses.
Yesterday evening I sanded a few parts and joints, glued the first frames and mixed the first batch of thickened epoxy. When the batch was empty I ran out of clamps. All good for the warmup! It took me about 2 hours.
Today I removed all the clamps from the first frames I did an sanded the the edges to get rid of bits of to much epoxy. Than I prepared two foam blocks, the transom and the remaining frame. Took me 3 more hours and was fun.
The day before yesterday I finally unboxed the big parts of the hull. Unfortunately I found some of the puzzle joints of panel 2 and the bottom cracked as a matter of handling by the transportation company. I fixed it by using a pipet filled with a little thickened epoxy to inject it into the cracks. It took me about an hour to fixe it.
Yesterday I found that my first aid was successful so I took another 90 minutes to glue the bottom + the ends of panels 1 + 2. As you can see I use my table tennis board for the glueing to have enough straight surface. I already started heating the garage to keep the temperature above 15 degrees celsius during the night to assure a solid curing process.
I am still trying to meet the right mix of thickened epoxy. But it seems to be a good experience to work different types of thickness. I will be an advantage when it comes to the fillets and other filling jobs.
Money spent so far:
Cost category Amount
Tools and workshop equipment
€509.86
Consumables and other project expenses €271.43
Northeaster Dory boat kits, including shipping and taxes
€5,023.10
Total project costs to date
€5,804.39