boatbuildlog

Hot Rod · new build

Launched

Glen-L Hot Rod

Make a book Feed The whole log, 12 entries and every photo, laid out as a book to print, bind and keep.
260
Entries
n/a
Hours
n/a
Written up afterwards
1203
Photos
Nov 2003
Started
Hull Panels Link

Fitting the port second bottom

1. Fitting the port second bottom.

2. Transition point.

3. Butt joint detail.

4. The second bottom's scarf joint is staggered 6" aft of the first bottom's joint.

1 Hot Rod: Fitting the port second bottom
2 Hot Rod: Fitting the port second bottom
3 Hot Rod: Fitting the port second bottom
4 Hot Rod: Fitting the port second bottom
Hull Panels Link

Both second bottom panels installed

1. Both second bottom panels installed.

2. Bow detail.

1 Hot Rod: Both second bottom panels installed
2 Hot Rod: Both second bottom panels installed

Nobody else here is logging a Hot Rod yet. See the boat.