Northeaster Dory to be assembled in Cologne Germany

It is the first boat I build. I‘ll do it in my single garage and partly in my cellar.

Make a book Feed The whole log, 23 entries and every photo, laid out as a book to print, bind and keep.
23
Entries
121
Hours
32
Days elapsed
65
Photos
Oct 2026
Started
Watch the 30 second boat build video

The film on its own page

Fillets & Taping · compare · other boats 9 h Link

Fillets way to slow

Fillets, fillets, fillets and at the end of the day a bit of glassing. Working without a helper takes plenty of time. The fillets are not finished jet and I worked from 12 to 6pm and after supper from 8 to 11 pm. Finally I glued the rails.

1 Northeaster Dory: Fillets way to slow
2 Northeaster Dory: Fillets way to slow
3 Northeaster Dory: Fillets way to slow
Fillets & Taping · compare · other boats 5.5 h Link

Big mistake!

Fatal mistake today! When I was about to do one of the last fillets I took hardener instead of epoxy and vice versa. Yep, it did not cure. Don’t know how this could happen. Every batch before I took so much care choosing the right container but finally it happened, I screwed it up. A bad day for boat building!

Glassing & Epoxy · compare · other boats 5.5 h Link

Troubleshooting and a bit more

I removed the fillets and tried to clean the areas as good as possible. Finally I swept everything with cloth dipped in Alkohol. Than I did new fillets. I used a wooden scraper with a slightly bigger rounded end to come around remaining edges that had cured on the surface. When that was done I did the glassing in the two first compartments from bow to stern. It felt good to move on. I finished gluing the rails and attached the „arm“ (can’t remember the english word, sorry) to the rudder.

1 Northeaster Dory: Troubleshooting and a bit more
2 Northeaster Dory: Troubleshooting and a bit more
3 Northeaster Dory: Troubleshooting and a bit more
4 Northeaster Dory: Troubleshooting and a bit more
5 Northeaster Dory: Troubleshooting and a bit more
Glassing & Epoxy · compare · other boats 5 h Link

Glassy Sunday

After a fun night out with Compass Mike, lots of drinks, good music I started the morning with a good breakfast to get my head straight. Starting around noon I finished the glassing on the inside bottom and cut off the fiberglass edges along the masking tape in the first two compartments from the bow to the middle. I am quite happy with the result and allow my self some tiny bumps as it is my first boat building experience. In the evening I glued the first thwart and started the mast thwart with cutting the hole for the mast and adding the rails. I had some thickened epoxy left and not enough screw clamps remaining for a second regular thwart. For the mast thwart there were plenty of spring clamps. It turned out that my jigsaw is pretty worn out so the cutting edge along the bottom line was a little inside. I had to use a rasp to meet the outline.

1 Northeaster Dory: Glassy Sunday
2 Northeaster Dory: Glassy Sunday
3 Northeaster Dory: Glassy Sunday
Hull Exterior · compare · other boats 8.5 h Link

Working outside

Today we had light sun and the temperature climbed above 15 degrees Celsius. Good conditions to work outside. As space is limited in the garage I always have to crawl underneath the boat to get to the other side if the gate is closed. With trimmed glass edges all around I flipped the hull with the help of my neighbor and gave it a little sanding before I started filling the gaps between the panels. The result is pretty nice. I always wonder how long all this takes. In the morning I had to prepare a meeting for tomorrow so I started at 11:30 and worked til 15:15, than my mother showed up. After a coffee break I kept working from 16:30 to 19:15. Finally I had a last shift from 22:00 to 00:00 .

1 Northeaster Dory: Working outside
2 Northeaster Dory: Working outside
3 Northeaster Dory: Working outside

Others building the Northeaster Dory