Glen-L Hot Rod

Make a book Feed The whole log, 40 entries and every photo, laid out as a book to print, bind and keep.
260
Entries
n/a
Hours
n/a
Written up afterwards
1203
Photos
Nov 2003
Started
Hardware & Fit-Out Link

Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls

Hose barb will take a 3/4" hose. Also visible in this photo are the two 3/8" annealed copper tubing hydraulic steering hoses. They're retained by bulkhead fittings bolted through the steel transom support uprights.

... and the fuel fill hose.

1. A 1-1/8" hole saw was used to install the two bilge pump thru-hulls.

2. The large white box is a plywood mockup of a 9.5 gallon fuel tank. A 2" fuel fill hose can be seen on the right of the photo. A 5/8" fuel vent hose with a high coiled loop is on the left.

3. Here's a better view of fuel vent hose...

4. The vent hose was routed to the sheer. Hose should be run 'downhill' so that water can't find its way back into the tank.

5. Stainless steel fuel vent fitting completes the fuel tank rigging ! We'll be taking our fuel tank mockup into a welding shop next week !

1 Hot Rod: Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls
2 Hot Rod: Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls
3 Hot Rod: Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls
4 Hot Rod: Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls
5 Hot Rod: Jump seats and fuel tank: A 1-1/8" hole saw was used to install the two bilge pump thru-hulls
Hardware & Fit-Out Link

Jump seats and fuel tank: We built up the jumpseat's leading edge with a piece of 1" x 2" stock and radiused the top

1. We built up the jumpseat's leading edge with a piece of 1" x 2" stock and radiused the top edge before laminating both sides with 10 ounce fiberglass cloth.

2. A stainless steel piano hinge will complete the assembly.

1 Hot Rod: Jump seats and fuel tank: We built up the jumpseat's leading edge with a piece of 1" x 2" stock and radiused the top
2 Hot Rod: Jump seats and fuel tank: We built up the jumpseat's leading edge with a piece of 1" x 2" stock and radiused the top
Hardware & Fit-Out Link

Jump seats and fuel tank: The 5/8" rubber fuel vent hose has been looped to form a high loop before its routed to th

1. The 5/8" rubber fuel vent hose has been looped to form a high loop before its routed to the sheer mounted fuel vent fitting.

2. The 2" fuel fill hose is directly below the deck fill fitting.

3. Here's a closeup shot of the unswitched 12 volt fuse block. This provides circut protection for the automatic bilge pump and any accessories that require unswitched 12 volt power.

1 Hot Rod: Jump seats and fuel tank: The 5/8" rubber fuel vent hose has been looped to form a high loop before its routed to th
2 Hot Rod: Jump seats and fuel tank: The 5/8" rubber fuel vent hose has been looped to form a high loop before its routed to th
3 Hot Rod: Jump seats and fuel tank: The 5/8" rubber fuel vent hose has been looped to form a high loop before its routed to th
Hardware & Fit-Out Link

Jump seats and fuel tank: Our custom aluminum fuels tanks arrived on the 23rd

Our custom aluminum fuels tanks arrived on the 23rd. The 9 gallon tanks were fabricated at a local welding shop in Ottawa, Ontario. The tanks were on back-order for some time now. We've been holding off on final assembly until they were installed. Let the assembly begin !

Hardware & Fit-Out Link

Tonneau cover: We've removed the tonneau cover from the boat and placed it on our trolley for sheeting an

1. We've removed the tonneau cover from the boat and placed it on our trolley for sheeting and finishing. Corners were built up from from two pieces of 3/4" plywood molded to a width of 3/4".

2–3. Decking is 1/4" G1S exterior plywood.

4. The remaining sub deck panels were glued and screwed. We're ready for fiberglass !

1 Hot Rod: Tonneau cover: We've removed the tonneau cover from the boat and placed it on our trolley for sheeting an
2 Hot Rod: Tonneau cover: We've removed the tonneau cover from the boat and placed it on our trolley for sheeting an
3 Hot Rod: Tonneau cover: We've removed the tonneau cover from the boat and placed it on our trolley for sheeting an
4 Hot Rod: Tonneau cover: We've removed the tonneau cover from the boat and placed it on our trolley for sheeting an