Port side first bottom ready to be epoxied
Port side first bottom ready to be epoxied.
Hot Rod · new build
LaunchedPort side first bottom ready to be epoxied.
Port first bottom.
1. Starboard side.
1. Port side.
2. Panels are butted in forward section, lapped in aft.
3. Transition point.
4. Butt joint detail.
1. Fitting the port second bottom.
2. Transition point.
3. Butt joint detail.
4. The second bottom's scarf joint is staggered 6" aft of the first bottom's joint.
Nobody else here is logging a Hot Rod yet. See the boat.